SSOC Information System

Reports in local Chinese media say that PetroChina and France’s Total are likely to start producing gas from Sulige South field in northern China next month. Full potential of the filed will be achieved in three years. Output from the field is seen reaching 3 billion cubic meters a year by 2015, reports said.

The two companies signed a 30-year production-sharing contract in 2006 for the evaluation, development and production of
the Sulige South gas block that covers 2,390 square kilometres. CNPC, the parent company of PetroChina holds 51% and Total 49%.

Source: http://www.naturalgasasia.com/pterochina-total-to-start-producing-gas-from-sulige-south-field-in-may-5280 (accessed 11.30 GMT, 5 Dec 2012).

SSOC’s management decided to have information management system to capture any data related to drilling activities and well intervention activities since the beginning.

Kaisansoft was responsible to develop the required system since Oct 2011. Until now, we are in the implementation and testing phases of the system. The system has the following main modules:

  • Creation and approval workflow for:
    • Well SOR (Summary of Requirement)
    • Drilling Program
    • Well Intervention Request
    • Well Intervention Program
  • Data capture for drilling report and well intervention report